Duyen Hai 3 Extension Thermal Power Plant
Coal Unloading Jetty

Owner: GENCO 1 - EVN.

Location: Tra Vinh Province, Vietnam.

EPC Contractor: Sumitomo Corporation.

Subcontractor: Mitsui Engineering & Shipbuilding

Our services include:

  • Detailed design Coal Unloading Jetty – Trestle 898.87m in length and 12.4m in width & Wharf 247.0m in length and 21.7m in width capable to accommodate 30,000DWT bulk carriers
  • Sedimentation Study of aterfront Area and CW Intae Canal