Inspection and verification of structure Upgrading of Interflour port

Interflour Port - 22/06/2020

Inspection and verification of structure Upgrading of the existing 75,000 DWT Berth for maximum berthing capacity of Interflour port.

Inspection and verification of structure Upgrading of Interflour port
HSE training work
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete’s strength of beams using rebound hammer
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete’s strength of beams using ultrasonic equipment
Inspection and verification of structure Upgrading of Interflour port
Inspection of the concrete Longitudinal beam defect by ultrasonic equipment
Inspection and verification of structure Upgrading of Interflour port
Inspection of geometrical dimensions of Transversal beam
Inspection and verification of structure Upgrading of Interflour port
Inspection of geometrical dimensions of pile
Inspection and verification of structure Upgrading of Interflour port
Inspection of slab thickness

Participation in Ho Chi Minh University of Technology Scholarship Awarding Ceremony

Ho Chi Minh City University of Technology, 29/05/2020

On Friday 29/05/2020, at Ho Chi Minh City University of Technology, Ci...

Presentation to Prime Minister Nguyen Xuan Phuc

BRVT - 30/05/2020

At Cai Mep - Thi Vai, Portcoast's General Director, Mr. Pham Anh Tuan,...

Portcoast's Weekend Seminar - 30/05/2020

Portcoast - 30/05/2020

Portcoast's Weekend Seminar...